![]() |
BEAVER BRIDGE
Location:Prince George, BC, Canada Description:Road and rail bridge. Total length: 348 m (1140 ft.)
Owner:Northwood Pulp and Timber Limited Client:Brittain Steel Ltd. Scope of Work:To avoid the risk of ice and flood damage to falsework in the river, this road and rail bridge was built on the bank and launched into position by sliding out two spans at a time tied together. Buckland & Taylor Ltd. designed the erection scheme for the Contractor. An interesting innovation was the use of rocker girders that automatically picked up the support of the bridge at panel points only and then released them as the truss slid past. Completed 1981.
For more information on our bridge engineering services, please Contact Us. |
|||