Buckland & Taylor Ltd. Bridge Engineering   ISO 9001:2000 Certified Bridge Engineers  

BURLINGTON BRIDGE

Burlington Bridge

Location:

Over the Mississippi River at Burlington, Iowa, USA

Description:

The Iowa Department of Transportation built this new cable-stayed bridge to replace the old MacArthur toll bridge, which opened in 1917 and was so structurally deficient that traffic restrictions were required. The new bridge is a single tower composite cable-stayed structure.

Total length including approach spans: 853 m (2800 ft.)
Main span: 201 m (660 ft.)
Tower height: 114 m (374 ft.)

Owner:

State of Iowa

Client:

John F. Beasley Engineering, Inc.

Scope of Work:

Buckland & Taylor Ltd. provided construction engineering to the Contractor for the balanced cantilever erection scheme. The scope included detailed step-by-step computer analysis of various erection schemes for construction loading, dynamic and static wind loading, time dependent effects, and thermal effects. Buckland & Taylor Ltd. also provided detailed construction procedures as well as geometry control and tracking data. Completed in 1993.


For more information on our bridge engineering services, please Contact Us.

↑ back to top
← back to previous page