![]() |
DRY GULCH BRIDGE
Location:Coquihalla Highway, BC, Canada Description:This is the longest bridge on the Coquihalla Highway through the British Columbia mountains. Total length: 265 m (869 ft.)
Owner:Government of British Columbia Client:Brittain Steel Ltd. Scope of Work:Buckland & Taylor Ltd. provided erection engineering assistance for the steel erector, in particular modification of the highline to carry heavier loads over a longer span. Completed in 1985.
For more information on our bridge engineering services, please Contact Us. |
|||