![]() |
SHAIKH ZAYED BRIDGE
Location:Abu Dhabi, U.A.E. Description:A twin deck bridge comprising prestressed concrete box girders supported by bearings on concrete piers and by hangers on a pair of 3D steel arches. The steel arches are connected to the concrete piers to transfer their loads to the foundation. Total length: 842 m (2762 ft.)
Owner:Works Department, Emirate of Abu Dhabi Client:Archirodon Construction (Overseas) Co. S.A. (Contractor)
Scope of Work:Since 2003, Buckland & Taylor Ltd. has been providing the erection engineering for the Shaikh Zayed Bridge.
It is expected to be completed in 2010. For more information on our bridge engineering services, please Contact Us. |
|||